Minimum order quantities, explained
The minimum is the first thing small properties ask about and the thing most often misunderstood. It applies per artwork, not per colour and not per size, which changes what a single run can cover far more than most buyers assume.
One artwork, one minimum
Five hundred bands per artwork. Colours and sizes can be mixed inside that run at no extra minimum.
Count in turnovers, not guests
Rooms times occupancy times turnovers in the period. A 40-room property with week stays uses roughly 500 bands in a season.
Keep the design undated
A band printed with a year is scrap in January. Undated stock carries across seasons and makes one run last.
Take delivery in phases if useful
A single order can be produced once and delivered in stages, which keeps the yarn or colour lot consistent across a season.
Why the number exists
It is not a commercial hurdle, it is setup. A run requires tooling, screens or a loom set to the artwork, a colour matched to a physical reference, and a proof approved. That work is identical whether the run is five hundred bands or fifty thousand, so below a certain quantity the setup dominates the unit price to the point where the price stops being meaningful. Five hundred is roughly where the numbers become sensible for both sides.
Mixed colours inside one run
This is the most useful thing a small buyer can know. One artwork across four colours is one run, not four, which means a small property can separate a spa entitlement, a standard stay and a child band inside a single minimum. What it cannot do is carry different logos — a second logo is a second artwork and a second minimum, which is the constraint that catches groups trying to cover several properties in one order.
What five hundred actually covers
At forty rooms and two guests per room, five hundred bands is roughly six full turnovers — a season for a property with week-long stays, a few months for a city hotel with short ones. Working it out this way rather than guessing usually reassures a small property that the minimum is a single annual order rather than a stockpile, and it identifies the properties for whom it genuinely is too many.
Ordering above the minimum
Unit price falls with quantity in steps rather than smoothly, because the steps follow production batching. It is always worth asking where the next step is: a property ordering 1,800 bands is often a short distance from a materially better price at 2,000, and nobody volunteers that unless asked. The counterweight is storage and the risk of a design change, so the right answer is the next step up rather than the largest one available.
Related
Read next.
Guide 06
Lead times
Production is 12 to 21 days by material. The clock starts at approval, not at enquiry, and transit is separate.
GuideGuide 08
Cost per wrist per week
The number in the quotation is not the number that governs the budget. Replacement rate usually is.
GuideGuide 01
Choosing a wristband
Four questions in order. Answer them honestly and the range narrows to one or two bands before price is discussed at all.
Guide
No obligation · reply within one working day
Work out what one run covers for you.
Runs start at 500. Describe the property and the volume, and we come back with a specification, a unit price and samples of the recommended band.