Lead times and how to plan a run

Almost every late delivery in this category is an approval that took three weeks, not a factory that ran slow. Understanding where the clock actually starts is what makes a season plan hold.

01

Fix the date you need bands on site

Not the date the season opens — the date the desk needs stock in hand, which is usually a week earlier.

02

Subtract transit

Separate from production and dependent on destination and mode. Air and sea are different plans, not different prices.

03

Subtract production

Twelve to twenty-one days by material. RFID and woven sit at the longer end; paper and vinyl at the shorter.

04

Subtract approval

Artwork proof, sample set and technical confirmation. This is the part that slips, and it is entirely within your control.

Lead times

The clock starts at approval

Production time is counted from written artwork and technical approval, because nothing can be cut, screened or set before then. A property that sends artwork on the first of the month and approves the proof on the twentieth has not bought a twenty-one day lead time; it has bought a forty-one day one. This is the single most common cause of a band arriving after a season starts, and it is fixed by naming an approver before the enquiry rather than after the proof.

Transit is a separate line, deliberately

Quoted lead times are production only. Transit depends on destination, mode and customs, and bundling it into a single headline number produces a figure that is wrong for everybody. It also hides the decision worth making: air freight compresses the schedule at a cost, sea does not, and knowing the split lets a property choose rather than discover.

RFID adds a step, not just days

A banded run with a transponder requires technical confirmation as well as artwork approval — the credential scheme, the sample test on a real door where room access is involved, and the encoding verification before dispatch. Those are sequential, not parallel, which is why RFID lead times sit at the longer end. Starting the technical conversation at the same time as the artwork one, rather than after it, recovers most of the difference.

Plan for the reorder you have not thought about

Seasons run long, bands get lost, and a property that ordered exactly enough runs out in the last fortnight — which is the worst possible time to be waiting three weeks. Either order a margin above the forecast, or agree a phased delivery from a single production run so the second tranche is already made. The second option costs nothing extra and removes the risk entirely.